October Schedule Lookahead


Now through mid-October - Crews will continue constructing and pouring the footings of the four sound/screenwalls being built between Los Altos Parkway and Golden View Drive. Wall footings are continuous strips of concrete that spread the weight of the walls across the soil and provide structural stability.


Week of October 8 - Crews will begin paving the new widened section of highway on the west side between Queen Way and Los Altos Parkway. Then, they will begin milling out the existing southbound lanes/shoulder and placing new asphalt. Once complete, traffic will be shifted to the newly paved westside of the highway so widening operations can take place on the east side (anticipated to occur mid-October).


Mid to Late October - Two back-to-back marathons, or major construction weekends, are anticipated to occur mid to late October. Plans are still being finalized and advance notice will be provided soon. During these events, drivers can expect Pyramid to be reduced to single-lanes.


Construction operations are weather dependent and subject to change.

 

Left Turns Prohibited Between Los Altos and Golden View


NDOT and Granite Construction urges the community to obey traffic laws while driving through the work zone. Recent traffic and access changes between Los Altos Parkway and Golden View Drive are in effect 24/7 for everyone's safety:

• Lanes shifted to the inside with reduced 11-foot lane widths

• No center turn lane and RIGHT TURNS ONLY permitted

• Speed reduced to 45 MPH


The center turn lane in this area has been removed in order to maintain two lanes in each direction on Pyramid Highway during construction. Left turns are prohibited to/from adjacent neighborhoods. Residents are encouraged to use Sparks Boulevard to circle around.

Please SLOW DOWN to allow residents in the area to safely turn into their neighborhoods.


 

Occasional Nightly Southbound Pyramid Closure

The southbound lanes on Pyramid Highway between Disc Drive and Farr Lane will be occasionally closed at nights through October. Nightly closures will occur between 9 p.m. and 4 a.m.

  • Southbound traffic will detour to Disc Drive to Sparks Boulevard, then to Baring Boulevard to McCarran Boulevard